Availability: | |
---|---|
Quantity: | |
ISB 1100AN-3
JASU
Nearly no scrap rate
Guaranteed hygienic requirement
Fixed orientation: ISBM machine could make bottles with the same orientation of screw, which could make the closures (screw cap, flip caps, pump, etc.) pointing in the same direction.
Shaping ability: the preform remains warm during the process, which could present a better shaping ability, a sharper angle.
Most beneficial bottling line
Less energy consumption while high output rates
Scrapless process meaning no flash to trim and no regrind.
High utilization of raw material, high yield, high rate of return on investment.
Does not require separate preform mold and machine.
Cut transferring cost of reforms/bottles.
Wokring Process of Injection Stretch Blow Molding Machine
Workplace 1 THE FIRST SERVICE POSITION
The plastic melt is injected into the parison under low injection pressure, and the neck of the bottle is precisely shaped. After proper control, the mold is opened and the mandrel and parison are transferred to
Workplace 2 THE SECOND SERVICE POSITION
Blow molding is completed in this cavity by cooling and forming station. (The mold cavity determines the shape and appearance of the bottle). The parison is inflated by the air coming out of the mandrel and close to the mold. Then, the mold is opened and the mandrel and the parison are transferred together
Workplace 3 THE THIRD SERVICE POSITION
Demoulding is completed at this station, and then packaging or filling is carried out through the assembly line. The three actions of injection, blow molding and demoulding are carried out at the same time, which is highly efficient and energy-saving.
Item | Unit | Machine Type | ||
ISB 1100AN-3 | ||||
Injection Part | Screw Diameter | mm | 50 | |
Screw L/D Ratio | L/D | 24:1 | ||
Screw Speed | r/min | 0-150 | ||
Theoretical Injection Capacity | cm3 | 481 | ||
Injection Pressure | MPa | 176 | ||
Max. Hydraulic Pressure | Kg/cm | 140 | ||
The Actual Injection Quantity | g(ps) | 452 | ||
Oz | 16 | |||
Screw Stroke | mm | 245 | ||
Clamping Part | Blow Clamping Force | KN | 150 | |
Clamp Tonnage | KN | 600 | ||
Wheel Diameter | mm | 1100 | ||
Max. Height | PP, PET, PETG, Tritan, PS, PC | mm | 200 | |
PC, PETG, Tritan, PS | mm | 220 | ||
Open Vertical Mode Trip | mm | 570 | ||
Others | Max. Pump Pressure | MPa | 16 | |
Servo Motor | Kw | 22 | ||
Mode Opening/Locking Motor (Double Pump) | Kw | 22 | ||
Electric Power | Kw | 12.2 | ||
Tank Volume | L | 420 | ||
Dimension of Machine | m | 4.5*1.95*3.4 | ||
Machine Weight | T | 9 | ||
--Parameters are subject to change without prior notice. --Providing PC, PET, PP, PS, PETG, TRITAN screw barrels according to customers' requirements. |
Nearly no scrap rate
Guaranteed hygienic requirement
Fixed orientation: ISBM machine could make bottles with the same orientation of screw, which could make the closures (screw cap, flip caps, pump, etc.) pointing in the same direction.
Shaping ability: the preform remains warm during the process, which could present a better shaping ability, a sharper angle.
Most beneficial bottling line
Less energy consumption while high output rates
Scrapless process meaning no flash to trim and no regrind.
High utilization of raw material, high yield, high rate of return on investment.
Does not require separate preform mold and machine.
Cut transferring cost of reforms/bottles.
Wokring Process of Injection Stretch Blow Molding Machine
Workplace 1 THE FIRST SERVICE POSITION
The plastic melt is injected into the parison under low injection pressure, and the neck of the bottle is precisely shaped. After proper control, the mold is opened and the mandrel and parison are transferred to
Workplace 2 THE SECOND SERVICE POSITION
Blow molding is completed in this cavity by cooling and forming station. (The mold cavity determines the shape and appearance of the bottle). The parison is inflated by the air coming out of the mandrel and close to the mold. Then, the mold is opened and the mandrel and the parison are transferred together
Workplace 3 THE THIRD SERVICE POSITION
Demoulding is completed at this station, and then packaging or filling is carried out through the assembly line. The three actions of injection, blow molding and demoulding are carried out at the same time, which is highly efficient and energy-saving.
Item | Unit | Machine Type | ||
ISB 1100AN-3 | ||||
Injection Part | Screw Diameter | mm | 50 | |
Screw L/D Ratio | L/D | 24:1 | ||
Screw Speed | r/min | 0-150 | ||
Theoretical Injection Capacity | cm3 | 481 | ||
Injection Pressure | MPa | 176 | ||
Max. Hydraulic Pressure | Kg/cm | 140 | ||
The Actual Injection Quantity | g(ps) | 452 | ||
Oz | 16 | |||
Screw Stroke | mm | 245 | ||
Clamping Part | Blow Clamping Force | KN | 150 | |
Clamp Tonnage | KN | 600 | ||
Wheel Diameter | mm | 1100 | ||
Max. Height | PP, PET, PETG, Tritan, PS, PC | mm | 200 | |
PC, PETG, Tritan, PS | mm | 220 | ||
Open Vertical Mode Trip | mm | 570 | ||
Others | Max. Pump Pressure | MPa | 16 | |
Servo Motor | Kw | 22 | ||
Mode Opening/Locking Motor (Double Pump) | Kw | 22 | ||
Electric Power | Kw | 12.2 | ||
Tank Volume | L | 420 | ||
Dimension of Machine | m | 4.5*1.95*3.4 | ||
Machine Weight | T | 9 | ||
--Parameters are subject to change without prior notice. --Providing PC, PET, PP, PS, PETG, TRITAN screw barrels according to customers' requirements. |